If under ordinary conditions, the employee’s
motivation is an influential reason for organization of project’s attainment
and attractiveness through decline periods, it is even further essential to
pursue the greatest approach to inspire human assets to develop the managerial
environment, exploit the routine of experts, specifically their productivity.
Agreeing inspiration and holding policies may increase managerial productivity,
escalate efficiency and cost-effectiveness and also please the singular desires
of teams (decreasing tension and career uncertainty during enhancing
reliability, engagement and work contentment) therefore, it will facilitate the
competitive market (Wiley, 2008;
Darrington and Howell, 2011).
Lim and Ling
(2012) discuss in the research it will be vital for
contractors to form a suitable operational background. And also there is a
relationship among working satisfaction and performs such as appreciating
members’ determinations, connecting them in creating main conclusions,
assigning work capacity properly, applying a system of act assessment and
adopting an adequate organizational structure (Tabassi, A.
A., Ramli, M., & Bakar, 2012). Cardoso,
Dominguez and Paiva (2015) have reviewed on new theoretical tactics for
escalation the motivation in construction projects.
According to Wiley (2008), the responses of the analysis were rated
the best five aspects which inspire them in the works: (1) worthy salaries;
(2)gratitude for effort; (3) career safety; (4) upgrade and progression; and
(5) fascinating effort. These consequences disclose that factors of motivate
employees revolute with time and can differ considerably through subdivisions.
Furthermore, these above evaluated factors can differ accordance with employ
position, profession, gender and earnings (Wiley, 2008).
Jarkas,
Radosavljevic and Wuyi (2014), identified the noticeable demotivational
features which are affecting to enactment and efficiency of project managers
(Engineers, Architects) in the State of Qatar: (1)poor financial incentive
schemes; (2)slow decision-making process by owners; (3)remuneration scale;
(4)delay in responding to RFI; (5)shortage of skilled labour force; (6)shortage
of materials; (7)clarity and completeness of technical specifications;
(8))frequent changing orders during execution; (9)drawings quality level; and
(10)rework. Moreover, due to the background of building process plus
exceptionality of any project, both, workers and site administration, improve a
pride, contentment, and self-esteem owing to perceiving regular progress
transforming into a visible product over their individual struggles. Therefore
not like other professions, wherever great career fulfillment tends to better
productivity, the fulfillment of project managers and it is resulted to high productivity
in project (Jarkas, Radosavljevic and
Wuyi, 2014).
The Shurrab
Mohammed, Abbasi and Khazaleh (2018), study evaluated the influence of six
motivational dimensions such as personal collaboration, assignment, working
environments, authorization, personal development, and compensation on
construction project managers' motivation in Jordan. Then, the construction
project managers were more interested with the payment and individual
improvement in Jordan. But, in Switzerland, construction project managers were
encouraged more with the duty and work attitude of his team as well (Seiler et al., 2012). The reason of this could be the culture and
the environment of the society and the country ranking and the economic level
of living. According to Fey (2005),
Russian managers, possibly at a lower level of the needs hierarchy, are
top interested by wages and providing of bonus. In disparity, Swedish managers,
who have their needs of hierarchy, are well inspired by having a satisfying
working background (Shurrab Mohammed,
Abbasi and Khazaleh, 2018).
Graboviy (
2016), evaluated the effective motivation methods
by using following factors.
1. Financial
- Piece-work payment, Time payment award for innovation, fee for the lack of
absenteeism (as opposed to the payment of sickness) Tuition fees (training,
retraining), Fee for business image
2. Non-financial
- Earned time off, Flexible work schedules, Enrichment of labor, Evaluation of
effectiveness, increased discharge (training), Career advancement
The staff who are working on site for very
long times seem to be intensified and considered by a tendency for deprived
scheduling, resource deficiency, confusion, violent management style and
emotional isolation. The administration style practiced on construction sites
by developing recognition, improving
scheduling efficiency and diminishing disordered environment of a
project (Smithers and
Walker, 2000).
References
Darrington,
J. W. and Howell, G. A. (2011) ‘Motivation and incentives in relational
contracts’, Journal of Financial Management of Property and Construction,
16(1), pp. 42–51. doi: 10.1108/13664381111116070.
Fey,
C. F. (2005) ‘Opening the black box of motivation: A cross-cultural comparison
of Sweden and Russia’, International Business Review, 14(3), pp.
345–367. doi: 10.1016/j.ibusrev.2005.03.004.
Graboviy,
P. (2016) ‘Methods of motivation improvement and effectiveness increase on the
example of construction industry enterprises’, Procedia Engineering.
Elsevier B.V., 165, pp. 1520–1528. doi: 10.1016/j.proeng.2016.11.888.
Jarkas,
A. M., Radosavljevic, M. and Wuyi, L. (2014) ‘Prominent demotivational factors
influencing the productivity of construction project managers in Qatar’, International
Journal of Productivity and Performance Management, 63(8), pp. 1070–1090.
Lim,
L. J. W. and Ling, F. Y. Y. (2012) ‘Human resource practices of contractors
that lead to job satisfaction of professional staff’, Engineering,
Construction and Architectural Management, 19(1), pp. 101–118. doi:
10.1108/09699981211192599.
Seiler,
S. et al. (2012) ‘An integrated model of factors influencing project
managers’ motivation - Findings from a Swiss Survey’, International Journal
of Project Management. Elsevier Ltd, 30(1), pp. 60–72. doi:
10.1016/j.ijproman.2011.03.002.
Shurrab
Mohammed, Abbasi, G. and Khazaleh, R. Al (2018) ‘Evaluating the effect of
motivational dimensions on the construction project managers in Jordan’, Engineering
, Construction and Architectural Management, 25(3), pp. 412–424. doi: https://doi.org/10.1108/
ECAM-01-2017-0001.
Smithers,
G. L. and Walker, D. H. T. (2000) ‘The effect of the workplace on motivation
and demotivation of construction professionals’, Construction Management and
Economics, 18(7), pp. 833–841. doi: 10.1080/014461900433113.
Wiley,
C. (2008) ‘What motivates employees according to over 40 years of motivation
survey’.